Storage heater leak replacement
A Tanjong Pagar condo client reported water leaking non-stop from a storage heater tank. GC Werkz isolated the affected tank to stop the leak without affecting…
View projectProject examples
Browse examples of plumbing repairs, reinstatement works, partitioning, electrical reconfiguration and renovation support completed for residential, commercial and industrial properties.
Recent project examples
These examples show the type of issues handled, the work carried out and the relevant GC Werkz service pages.
A Tanjong Pagar condo client reported water leaking non-stop from a storage heater tank. GC Werkz isolated the affected tank to stop the leak without affecting…
View projectGC Werkz renovated the living quarters of a Clementi shophouse to improve functionality and rental appeal for overseas students and faculty from nearby tertiary institutions. The…
View project
A co-living operator in Loyang needed to make-good a condominium ensuite room during tenant turnover. During inspection, defects were found in the bathroom, including a stuck…
View project
A client in Ubi Techpark wanted the electrical circuits in a newly acquired office and warehouse separated so the spaces could be rented to two different…
View project
The acquired inter-terrace landed house had multiple dated, worn, faulty, or unwanted fixtures and fittings that needed to be repaired, replaced, removed, serviced, painted, polished, or…
View project
A condominium owner at The Trilinq in Clementi reported water dripping from the ceiling board above his bathroom. The leak volume was inconsistent, and GC Werkz…
View project
A homeowner client needed his condominium unit at The Meyer in Marine Parade prepared for handover to a new tenant. The unit had multiple defects, including…
View project
A client at Eunos Techpark reported water leaking through the ceiling board from above the window sill during rain. Inspection found water dripping from the aircon…
View project
A client at Ubi Centre wanted her rooms partitioned to target tenants with smaller floor space requirements. GC Werkz surveyed the space and recommended a configuration…
View project
A client living in a house along Upper East Coast Road reported that his bidet hose had burst. The existing valve arrangement meant that shutting off…
View project
The owner of a shop in Teban Garden had partitioned the space into two sub-units for separate tenants with smaller space requirements. However, the electrical circuits…
View project
A client in MacPherson wanted his apartment house renovated. GC Werkz assisted with laying new wiring and plumbing, then installed new fanco fan-lights, fluorescent light tubes,…
View project
The owners of a factory unit at Eunos Techpark needed the premises reinstated after their tenant’s tenancy ended. GC Werkz assisted by dismantling and disposing of…
View project
Tenants in a co-living unit at a condominium in Sembawang were trapped inside after the spindle of the main door knob broke from the latch assembly.…
View project
A client who rented a space along Alexandra Road needed the premises and electrical system reconfigured to suit the designed electrical layout. GC Werkz assisted by…
View project
A shop along Chai Chee Road required partial reinstatement after a change in owners. GC Werkz assisted with hacking off the old tiled facade, making good…
View projectHave a project to discuss?
For current work enquiries, send photos, a short description, property type, access notes and preferred timing so GC Werkz can advise the next practical step.