A factory unit at Eunos Techpark required reinstatement after the tenant's tenancy ended. GC Werkz dismantled and disposed of partition walls, re-aligned affected aircon coolant and drain pipes, and replaced damaged fluorescent tubes to support the post-tenancy handover condition.
Project example
Eunos Techpark Factory Reinstatement
A factory unit at Eunos Techpark required reinstatement after the tenant's tenancy ended. GC Werkz dismantled and disposed of partition walls, re-aligned affected aircon coolant and drain pipes, and replaced damaged fluorescent tubes to support the post-tenancy handover condition.
Work summary
What was done
The details below summarise the reported issue, confirmed finding, work scope and completed outcome.
The factory unit required reinstatement after the tenant's tenancy ended, including partition removal, affected aircon pipe alignment and lighting replacement.
Partition walls had to be removed, affected aircon coolant and drain pipes required re-alignment, and damaged fluorescent tubes needed replacement.
Dismantle partition walls
Dispose of dismantled partition wall materials
Re-align affected aircon coolant pipes
Re-align affected aircon drain pipes
Replace damaged fluorescent tubes
The reinstatement works focused on removing tenant-related partitioning and addressing affected services and lighting. After the partition walls were dismantled and disposed of, GC Werkz re-aligned the affected aircon coolant and drain pipes and replaced damaged fluorescent tubes.
The factory unit was reinstated after the tenancy ended, with partition walls removed, affected aircon pipes re-aligned, and damaged fluorescent tubes replaced.
Project photos
Before and after photos.
Project FAQ
Common questions about this project.
Why did the factory unit need reinstatement?
The owners needed the unit reinstated after their tenant’s tenancy ended.
What partition works were carried out?
GC Werkz dismantled and disposed of the partition walls.
Were aircon services affected by the reinstatement?
Yes. The affected aircon coolant and drain pipes were re-aligned.
Were lighting works included?
Yes. Damaged fluorescent tubes were replaced.
Which service pages is this project most relevant to?
This project is most relevant to Reinstatement Contractor Singapore, Commercial Unit Reinstatement Singapore, and Repair Services Singapore.
Need help with a similar scope?
Send the work details for review.
Share photos, property type, access notes and preferred timing so GC Werkz can review your enquiry and suggest the next practical step.
