Project example

Electrical Reconfiguration Works at Alexandra Road

A client who rented a space along Alexandra Road needed the premises and electrical system reconfigured to suit the designed electrical layout. GC Werkz assisted by re-configuring the Power Distribution Board, laying new wiring, and installing new electrical fixtures. The works helped align the rented space’s electrical setup with the intended layout for the client’s use.

Work summary

What was done

The details below summarise the reported issue, confirmed finding, work scope and completed outcome.

Summary

A client who rented a space along Alexandra Road needed the premises and electrical system reconfigured to suit the designed electrical layout. GC Werkz assisted by re-configuring the Power Distribution Board, laying new wiring, and installing new electrical fixtures. The works helped align the rented space’s electrical setup with the intended layout for the client’s use.

Problem

The rented space required reconfiguration, including changes to the electrical system to match the designed electrical layout.

Diagnosis

The Power Distribution Board and electrical wiring needed to be reconfigured to suit the designed electrical layout.

Scope

Re-configure the Power Distribution Board
Match the electrical system to the designed electrical layout
Lay new wiring
Install new electrical fixtures

Execution

The works focused on aligning the electrical infrastructure with the planned layout of the rented space. GC Werkz adjusted the Power Distribution Board configuration, laid new wiring according to the intended electrical arrangement, and installed the required electrical fixtures.

Outcome

The rented space’s electrical system was reconfigured to match the designed electrical layout, with new wiring and electrical fixtures installed.

Project photos

Project FAQ

Common questions about this project.

What was reconfigured in this Alexandra Road project?

The rented space and electrical system were reconfigured to match the designed electrical layout.

What did GC Werkz do to the Power Distribution Board?

GC Werkz re-configured the Power Distribution Board to match the designed electrical layout.

Was new wiring installed?

Yes. GC Werkz laid new wiring as part of the electrical reconfiguration works.

Were electrical fixtures installed?

Yes. GC Werkz installed new electrical fixtures after the electrical system was reconfigured.

Which service pages is this project most relevant to?

This project is most relevant to Commercial Renovation Singapore and Repair Services Singapore.

Need help with a similar scope?

Send the work details for review.

Share photos, property type, access notes and preferred timing so GC Werkz can review your enquiry and suggest the next practical step.